Price list

Hour Rates


6.5 T Excavator $ 150.00 Hour
Laser-planer tractor $ 150.00 Hour
Truck 6-Wheeler Tipper $ 180.00 Hour

Big Excavators and plant are to be priced in the quoted price due to the ever-changing fuel and transport costs.


Truck Floats


Up to 25 km from Narooma $ 150.00
Up to 25 km to 50 km from Narooma $ 300.00
Up to 50 km to 100 km from Narooma $ 600.00
Note: Max 6.5 T Equipment
Prices are one-way if not my Equipment

Truck 6-Wheeler Tipper Hire


Day Hire Only $ 1800.00
Note: Tipper Hire at $150 an hour is to be at my discretion

Clean Fill Removal And Supply


One 6-wheeler bin load of Clean fill is $ 500.00
If u provide the tipper spot
An hourly rate of $ 180.00 to run the truck
And $100 for the excavator to load the truck can be arranged.

Site Cuts: in preparation for building a house or shed


1-Day Cut and preparation $ 1575
2-Day Cut and Preparation $ 2550
3-Day Cut and Preparation $ 3525
Construction driveway up to 10 m $ 500
Note: Rock removal is an extra $ 180 an hour for the hammers on the excavator.
Cut over 3 Days to be quoted before start.
Fill Removal is extra.

External Drainage Excavation.

6t Excavator.

Excavation and backfill $ 1075

Float added over 25km from Narooma, Note: Rock removal is an extra $ 180 an hour for the hammers on the excavator. Fill Removal is extra

Underground Tank Excavation

Excavation and backfill $1075

Float added over 25km from Narooma,

Note: Rock removal is an extra $ 180 an hour for the hammers on the excavator. Fill Removal is extra

Pool Excavation

1-Day Cut and preparation $ 1575

2-Day Cut and Preparation $ 2550

3-Day Cut and Preparation $ 3525 Note: Rock removal is an extra $ 180 an hour for the hammers on the excavator. Cut over 3 Days to be quoted before start.

Fill Removal is extra

Rural Drive Way Repair and Maintenance

Note:

Price does not include materials

1-Day Cut and preparation $ 1575

2-Day Cut and Preparation $ 2550

3-Day Cut and Preparation $ 3525

Note: Rock removal is an extra $ 180 an hour for the hammers on the excavator. Cut over 3 Days to be quoted before start. All materials are extra and are to be paid up front. Fill Removal is extra.

New Rural Gravel Drive Way

About $60,000 a 1 km

To be quoted before the start

Land Clearing

$ 5000 an acre or 4047 Square Metres

Big tree removal is extra. More than 300 mm in diameter to be quoted before start.

Rates are plus the Goods and Services Tax (GST) 10%